6920 solar panels
3.7 mWp power
1,703,012 kg CO2 savings
At the Aldi in Deventer ProfiNRG for Brusche Electrical Engineering 6920 solar panels of 535Wp installed. A very nice project totalling 3.7 MWp!
Non-binding advice
for sustainable
energy solutions
Stay informed about the energy transition, register below.
Profinergy BV
Copyright © 2024. Alle rechten voorbehouden.