22,352 solar panels
9.6 MWp
5800 tonnes of CO2 savings
The project site totals about 10 hectares. Of this, over 5 hectares is available for the solar park. The special feature of this project site is that it is a strip 2.4 kilometres long. A park of this length involves specific issues. The engineers in our technical department have worked out specific solutions for this.
The solar farm was built in the first quarter of 2020 and has been operational since March 2020. The solar park has an east-west arrangement. This generates renewable electricity throughout the day.