Energy storage Powerplay Phillipine & Bergambacht

Contribution to energy transition

Battery capacity

2 x 1 MW / 2 MWh

Technology

BESS: Huawei
PCS: Huawei
EMS: With The Grid
Transformer: LV Trading

In operation since

March/April 2025

Featured

BESS at 2 locations

Advanced energy storage systems have been realised for PowerPlay at two locations in the Netherlands: each with a capacity of 1 MW / 2 MWh. The systems are fully operational and deployed to participate in energy markets via large grid connections.

ProfiRNG handled the entire EPC process: from engineering and project management to installation, IT, civil works, and monitoring & maintenance.
Key components were:

  • Supply and configuration of batteries, inverters, BMS & EMS

  • Complete cabling and connection of MV/LV transformers

  • Civil works, foundations, cabling & security

  • Monitoring via SynaptiQ dashboard

  • Long-term service contract including preventive and corrective maintenance

Results:
A future-proof energy system with maximum efficiency, minimum grid dependence and high utility value for both tenants and property owners.