Solar park Hooibroeken

Status: Commissioning March 2025

Contribution to energy transition

Capacity

31 MWp

Production

30,000 MWh per year

CO2 reduction

22,000 tonnes per year

Featured

ProfiNRG has started construction of Zonnepark Hooibroeken in Heusden

ProfiNRG has started construction of Zonnepark Hooibroeken. The planned solar park is located on Polderweg near the N267 in Oudheusden. The plot has about a total area of 24 hectares on which a Natural Solar Park will be developed on 21 hectares, which will be properly landscaped and landscaped with lots of greenery.

The solar park has been developed by Sunvest and the local energy cooperative Energiek Heusden.

The first piles are currently being driven into the ground.


Update March 2025:

Solar farm Hooibroeken almost operational!

The first pile was driven in July 2024, and now, in March 2025, the last solar panels have been successfully installed. With a capacity of 31 MWp, Zonnepark Hooibroeken will soon provide renewable energy to thousands of households. The official commissioning will take place at the end of March, making the park fully operational. A wonderful step towards a greener future! 🌿☀️