15.2 MWp
14,000 MWh per year
8,200 tonnes per year
Solar park the Broek Beuningen totals about 10 hectares. The structure has now been built and installation of the solar panels has started (mid-July). A total of 25,156 solar panels of 605Wp will be connected to 32 inverters.