Hoe wordt mijn SDE++ Berekend? Fase- en Correctiebedrag Uitgelegd
Hoe wordt mijn SDE++ berekend? Fase- en correctiebedrag uitgelegd. Hoe wordt mijn SDE++ berekend? De berekening van de SDE++ subsidie is een essentieel aspect voor bedrijven en instellingen die duurzame energieprojecten willen realiseren. Deze berekening is gebaseerd op twee cruciale componenten: het fasebedrag en het correctiebedrag. Hieronder wordt uitgelegd hoe deze bedragen werken en hoe […]
Overbetuwe solar farm
Overbetuwe Solar park Contribution to energy transition Capacity 86 MWp Production 80,000 MWh per year CO2 reduction 48,000 tonnes per year Highlighted Overbetuwe Solar park our most impressive project to date The project site totals around 80 hectares. Of this, about 60 hectares is available for the solar park. The site is sandwiched between A15 and Betuweroute. The [...]
Share of renewable energy grew to 17 per cent
Share of renewable energy grew to 17 per cent By 2023, 17 per cent of the energy used was from renewable sources, and the share of renewable electricity rose to around 50 per cent. Biomass and wind turbines provided the largest share of energy, followed by a growing share of solar power. This is according to the annual figures of energyopwek.nl. The past [...]
Halt Dutch solar parks of temporary nature, there's no way around it
Halt Dutch solar parks of temporary nature, there is no other way The realisation of large solar roofs and solar parks is under pressure in the Netherlands. ProfiNRG is therefore pressing ahead with internationalisation says Cees van de Werken. You manage engineering, procurement and construction (epc) company ProfiNRG. How did you fare in 2023?'Good. With a total of 300 megawatt peak [...]
Solar park Cothen
Solar park Cothen Contribution to energy transition Capacity 14 MWp Production 11,000 MWh per year CO2 reduction 8,000 tonnes per year Highlighted Pear orchard makes important contribution to climate neutral 2030 ambition Wijk bij Duurstede This former pear orchard will from now on make an important contribution to the ambition Wijk bij Duurstede climate neutral 2030. In autumn 2021 [...]
Solar park Koningspleij - Arnhem
Solar park Koningspleij - Arnhem
Sun on greenhouse Luttelgeest
Contribution to energy transition Capacity 20,000 solar panels Production 8.2 MWp capacity CO2 reduction 2,884,200 kg CO2 savings Highlighted Back to project overview Solar energy is the most popular source of renewable energy among Dutch greenhouse farmers. However, mass installation of solar panels on greenhouses is not yet a reality. 'It is therefore new and there are many complicating [...]
Southbroek solar farm
ProfiNRG designed, built and commissioned Zonnepark Zuidbroek (50MW) in 1 year. Of course, we are quite proud of that! That is why the above video was made in which our colleague Jesper van Beek takes you on a tour of this wonderful project. We also recently started the 21.6 MWH battery project at the solar park. About that soon [...]
Stone Base and H. Swanenberg of 's-Hertogenbosch preserves
Stone Base and H. Swanenberg from 's-Hertogenbosch sustainable with PV system from ProfiNRG Stone Base and Handelsonderneming H. Swanenberg B.V., based in 's-Hertogenbosch, are a wholesaler specialising in paving materials, indoor flooring, gravel, grit and road salt. They also provide water-bound storage and transhipment of bulk materials and general cargo. As sustainability is of paramount importance to this [...]
ProfiNRG starts 3 projects in Enschede
ProfiNRG starts 3 projects in Enschede For energy cooperative Enschede Energie | om, ProfiNRG has recently started 3 projects in Enschede: At project Kromhofsweg (1.14MW), the first 1TP5 inverters and # solar panels have already been installed. At project Roodmolen (5MW) we recently started with the AC cables and ramming the poles. At project Elsmoat (3.94MW), we have started laying the [...]