Final advice on basic amounts SDE++ 2024

Final advice on basic amounts SDE++ 2024 Basic amounts for solar panels down to 14% Outgoing minister Jetten has received advice from the Netherlands Environmental Assessment Agency (PBL) to reduce the basic amounts for solar panels to 14% for the SDE++ 2024. For the SDE++ 2023, the subsidy amounts were actually increased due to increased costs. The biggest reduction [...]
Battery project Hoofddorp

Battery project + charging hub in Hoofddorp Contribution to the energy transition Storage capacity 2 MWh Equivalent to 400 small home batteries Power capacity 1 MW In the spotlight “A game-changer for the use of renewable energy” ProfiNRG was commissioned by this client in Hoofddorp to supply and commission the battery. The client explains: “At the heart of this advanced BESS system is a vast solar panel array comprising 5,000 panels, which […]”
Agri-PV in Almelo

Aadijk Solar Park and Agri-PV, Almelo Contribution to the energy transition Capacity 45 MWp Annual generation 43,000 MWh CO₂ reduction 20,000 tonnes per year Spotlight: Solar and Agriculture in Aadijk, Almelo Commissioned by Klimaatfonds, ProfiNRG was tasked with building this solar park, including the Agri-PV component. Klimaatfonds Nederland is building, managing and (co-)financing the Aadijk II Solar Park in Almelo. A solar park of approximately 45 […]
SDE++ 2024: €11.5 billion subsidy

The budget for subsidy scheme SDE++ 2024 has been increased to €11.5 billion. The scheme opens 10 September and allocates extra money for solar panels on weak roofs and nature-inclusive solar parks for the first time. The now outgoing minister Jetten reported as recently as last May that 8 [...] billion euros will be available through the Stimulation of Sustainable Energy Production and Climate Transition (SDE++) in 2024 [...]
Logistics company, Asten

Logistics company, Asten Contribution to energy transition Capacity 860 solar panels Production 391 KW power CO2 reduction 850 kg CO2 per year
Tulip nursery, Oude Niedorp

Tulip nursery, Oude Niedorp Contribution to energy transition Capacity 2.10 MW Production 1,717 GWh per year CO2 reduction 789 tonnes per year Highlighted 𝟓𝟎𝟎𝟎 𝐳𝐨𝐧𝐧𝐞𝐩𝐚𝐧𝐞𝐥𝐞𝐧 𝐢𝐧 𝟏𝟎 𝐰𝐞𝐤𝐞𝐧! Thanks to good work preparation, this project in Oude Niedorp could be assembled in 10 weeks. The 5069 solar panels of 415Wp were mounted on a Sunbeam BV Luna substructure and connected to [...]
Agri PV: vertical mounting of bifacial panels

Agri PV: vertical mounting of bifacial panels With the rise of bifacial panels, the question of whether panels can be mounted vertically is being asked more and more often. On this page, we explain the advantages of using vertically mounted solar panels. Advantages vertical solar panels (agri pv) Vertical solar panels have several advantages over [...]
Overbetuwe solar farm

Overbetuwe Solar park Contribution to energy transition Capacity 86 MWp Production 80,000 MWh per year CO2 reduction 48,000 tonnes per year Highlighted Overbetuwe Solar park our most impressive project to date The project site totals around 80 hectares. Of this, about 60 hectares is available for the solar park. The site is sandwiched between A15 and Betuweroute. The [...]
Visit us during SolarSolutions from 19 to 21 March

Visit us during SolarSolutions from 19 tm 21 March From 19 to 21 March, ProfiNRG will be present at SolarSolutions. Our stand number is D1 and is located immediately to the left of the entrance. We hope to meet you there for a good conversation over a cup of coffee. We will be happy to tell you more [...]
Solarpark Zuidbroek

Zonnepark Zuidbroek Contribution to energy transition Capacity 90,368 solar panels & 8 battery containers of 2.7 MWh Production 50 MW solar energy / 21.6 MWh battery storage CO2 reduction 22,770 tonnes per year Highlighted Zonnepark Zuidbroek, our first large park with energy storage ProfiNRG designed, built and commissioned Zonnepark Zuidbroek (50MW) in 1 year. Naturally, we are [...]